Monitoring Lantai Produksi

Ringkasan performa lini produksi, pencapaian target SPK, dan OEE

Total Hasil (Good)
2,042/ 6,000 pcs
Progres Target34.0%
Barang Cacat (Reject)
42 pcs2.0%

Toleransi defect pabrik: maks 3.0%

Mesin Aktif Beroperasi
2 / 4Workstation

1 Maintenance, 1 Menunggu Bahan

Rata-rata OEE Lini
87.4%+2.1% minggu ini

Standar target OEE pabrik: > 85%

SPK yang Sedang Diproses

Surat perintah kerja aktif di lantai produksi

WO-2026-001• Line 1 (Injection)RUNNING
Komponen Casing Plastik Box Type-A
Kode Part: PRD-A01
Good: 742 / 1000Reject: 1874%
WO-2026-002• Line 2 (Assembly)RUNNING
Wiring Harness Automotive 12V
Kode Part: PRD-B02
Good: 620 / 800Reject: 1278%
WO-2026-003• Line 3 (Stamping)COMPLETED
Cover Bracket Metal Stamping 45mm
Kode Part: PRD-C03
Good: 500 / 500Reject: 8100%
WO-2026-004• Line 1 (Injection)PAUSED
Gasket Seal Silicone 80mm
Kode Part: PRD-D04
Good: 180 / 1200Reject: 415%

Log Tembakan Terakhir

Live
Heri Purnama15:06:40
WO-2026-001 • MCN-01+1 GOOD
Heri Purnama15:06:12
WO-2026-001 • MCN-01+1 GOOD
Ahmad Fauzi15:05:55
WO-2026-002 • MCN-02+1 REJECT
Alasan: Crimping Longgar (Terminal Loose)
Heri Purnama15:05:20
WO-2026-001 • MCN-01+1 GOOD
Ahmad Fauzi15:04:48
WO-2026-002 • MCN-02+1 GOOD
Pencatatan langsung dari scanner mobile di line produksi